Controversy continues to rage over a proposal to site wind turbines in Lake Ontario off the Scarborough Bluffs.
According to November 25th Toronto Star more than 1,000 people turned out for an ”information” meeting at Wilfrid Laurier School on the Guildwood Parkway last night. It is not clear whether much information was conveyed but it appears there was no shortage of opinions.
At this stage, as I understand it, Toronto Hydro Energy Services is merely asking to place a small weather station on a platform in the lake to see if wind turbines in this location would be feasible.
Meanwhile, according to the St. Thomas Times Journal, residents are unhappy about a proposed solar farm that OptiSolar Farms Canada wants to build just west of Belmont near London. When complete the project would provide 20 megawatts of electricity, enough to supply 3,000 homes.
“Already, some neighbours are grumbling about it, ” reports the paper.
OptiSolar vice-president Peter Carrie concedes is the project presents "a great challenge." No kidding!
A little closer to us in Nanticoke radiation specialist Doug Boreham has been hired by Bruce Power as “a key player” at open houses related to the proposed construction of two nuclear reactors. Open houses will be held in Simcoe, Jarvis, Port Dover and Cayuga.
The Simcoe Reformer quotes Power: "One of the biggest obstacles we have to overcome on these projects are people's fears of radiation." Indeed.
I could go on. The news is full of this stuff but, hey, I’m too busy getting my objections ready to a site plan application for the redevelopment of the Appleby Mall – a property in my back yard. There is a meeting tonight.
I’m not sure what this is all about, but it can’t be good.